Strongbuild Bella Vista

ext
main-(1)
IMG_3335
Client: Strongbuild
Project: Aveo
Location: Norbik Road, Bella Vista
Date: October 2016 to February 2018
Crane: Comedil CTT332-16
Personnel: Reds Global crane crew

This project is a retirement village consisting of a mix of 1, 2, 3 bedroom apartments and penthouses. 

This project was the second CLT (Cross laminated timber) project that we have worked on with Strongbuild.  The tower cranes used on site were brand new CTT-332’s with a winch capacity of 16,000kg and a jib length on site of 75 meters to cover the entire project.  The CTT-332 was chosen for the lift capacity of 3000kg at 75mtrs and with most of the CLT packs weigh above 2000kg.  The CTT-332 could position these packs anywhere on site.  This saved Strongbuild countless hours of manual handling through to job.